Over time, this
station has developed into a modern, spacious, and well laid-out arrangement,
tailor-made to the need for non-stop services to overtake slow trains. Headcorn
came into use on 31st August 1842, when passenger services were extended
eastwards from Tonbridge. Previously, through running between London Bridge and
Tonbridge, via Reigate Junction (Redhill), had commenced on 26th May 1842.
Headcorn temporarily served as the eastern terminus of the SER’s fledgling main
line to the Kent Coast, until further piecemeal openings of the route saw
passenger trains reach Ashford on 1st December 1842, and Folkestone (albeit a
temporary station initially) on 28th June of the following year. Through running
to Dover finally commenced on 7th February 1844.
Eventually, the station became a typical SER countryside affair, fitting for
rural Kent, despite residing on a main line. The company’s trademark staggered
platform arrangement came into use here, around a double-track, and both
surfaces were linked by a track foot crossing. The platforms were organised in a
fashion which ensured that passengers crossing the track always passed behind a
train stabled in either platform. The ‘’down’’ side was host to the main
building: this was a single-storey affair, fabricated from tongue-and-groove
timber, and featured a slated pitched-roof and three brick-built chimneystacks.
Virtually identical structures also came into use at Marden, Staplehurst, and
Pluckley, and reflected the SER’s ‘’economical’’ approach to station
construction. None of these buildings were graced with canopies, and their
platform-facing façades featured a trio of double-door sets and an equal number
of casement window frames. Headcorn’s ‘’up’’ platform was host to a rather
frugal wooden waiting shelter, which featured a backward-sloping roof – this,
too, was devoid of a canopy. Both platforms were backed at their rears by wooden
fences, these of which still remain a feature of nearby Pluckley today.
Headcorn incorporated similarly interesting goods facilities as those which were
in evidence down the line at Staplehurst. Sandwiched in-between the staggered
platforms, accompanying the foot crossing, was a single-track intercepting both
running lines at right angles. At either end, this track fed small wagon
turntables, the latter of which were common features of Victorian goods yards.
Four sidings and a single dock line were in evidence on the ‘’down’’ side, to
the west of the platform. One siding fed straight off the wagon turntable here;
the dock line was similarly accessed via the turntable. Of the three remaining
westward-facing sidings, two were lengthy affairs running alongside the ‘’down’’
running line, and early maps suggest that one of these terminated within a goods
shed. Before reaching the goods shed (this of which was brick-built,
single-storey, and featured a slated pitched-roof), the sidings served a trio of
coal stacks and sprouted a fourth siding. Conversely, the ‘’up’’ side was host
to a single siding, positioned to the east of the platform: this had a trailing
connection with the adjacent running line and was also linked to the nearby
wagon turntable. Some change appears to have occurred during the 1880: this
included the conversion of the goods shed to a through affair, to allow a direct
connection with the behind wagon turntable. A two-storey-high clapboard signal
box, of SER design with sash-style windows, also emerged at the eastern end of
the ‘’up’’ platform.
Of importance in this station’s history is the coming of Holman Stephens’ Kent &
East Sussex Railway. The line came into use between Robertsbridge (on the
Hastings route via Tunbridge Wells) and Tenterden on 26th March 1900. An
eastward extension of about 1⅓-miles was later made to a more conveniently
located ‘’Tenterden Town’’ station, which opened to traffic on 16th March 1903.
The final piece of the jigsaw, an
extension from Tenterden Town to the SE&CR main line at Headcorn, was made in
1905, passenger services commencing along this section on 15th May of that year.
At Headcorn, the K&ESR was provided with a dedicated platform face, which ran
parallel with the rear of the SE&CR station’s ‘’up’’ side. Waiting accommodation
existed in the form of a corrugated iron shelter, which had been brought to the
site from Tenterden Town. At the latter, a more permanent brick-built affair was
erected, and this remains in existence today. A physical link between K&ESR and
SE&CR metals was made at Headcorn by means of a single track which spurred off the
existing ‘’up’’ siding, to the east of the platform.
The SER had shown foresight at Tonbridge, Paddock Wood, and Ashford, by
providing four tracks, allowing non-stop expresses to overtake slow services.
Similar provision had not been made at Headcorn, presumably because under SER
tenure, the station did not posses the junction status which the aforementioned
trio of sites did. This later became problematic and consequently, the Southern
Railway published expansion plans in 1926. These
included the total abolition of the existing ‘’up’’ side infrastructure: the SR
and K&ESR platforms were swept away, and the SER signal box was demolished. The
existing running lines were slewed just south of their original positions, and a
pair of loops were inserted to serve the platforms. The then new ‘’up’’ platform
was built directly opposite its ‘’down’’ side counterpart, and the latter itself
was lengthened and rebuilt in concrete, to match the former. Both surfaces were
linked by a 70-foot long lattice footbridge, and a new curved K&ESR platform
came into use behind the ‘’up’’ surface. An indirect single-track connection
between K&ESR and SR metals was made to the west of the ‘’up’’ platform: trains
would be required to perform a headshunt manoeuvre, which subsequently gave
access to the ‘’up’’ platform loop. The revised track layout, completed in 1930,
was controlled by a new signal box, positioned immediately west of the ‘’up’’
platform: it was two-storeys high, mostly of brick composition, but featured
timber roof gables at either end.
Headcorn: Railtrack 1996
Track Plan of the wholly rebuilt Headcorn station, including Channel Tunnel loop and twin-span footbridge. Please note that this is a large
drawing of considerable width. Drawn by David Glasspool
22nd June 2007

A westward view depicts Class 465 No. 465031 trundling along the ''down'' platform loop with an Ashford
stopping service. On the right is the car park, which now sits on the former site of the goods yard. On the
left can clearly be seen the CTRL loop, completed in 1994. David Glasspool
22nd June 2007

An eastward view shows the Channel Tunnel freight loop in the foreground, passing over the former site of the
K&ESR station. The latter has not been wholly obliterated, however, and a section of concrete platform can
still be found in the vegetation on the right, beyond the palisade fencing. Stabled in the ''down'' loop is No.
465031, whilst in the ''up'' loop is No. 465922. David Glasspool
Next: The History Continues >>
Return to the Kent Rail Homepage or alternatively, check for Updates.
Website & Copyright information - Links - Contact the Webmaster
All content is copyright © David Glasspool