

Ebbsfleet International
Construction Photographs
10th May 2004

The view towards Ebbsfleet on a wet 10th May 2004, the first day of track laying. The first
sections of track are in evidence at the bottom right of the picture. Before the coming of the
railway, a footpath crossed the site, but this was closed during the main works. The new
footbridge seen crossing the track beds subsequently formed part of this dedicated pathway.
David Glasspool

The scene just north of the previous picture, looking towards the threshold of the Thames tunnels
at Northfleet on 10th May 2004, reveals a noticeable gradient of the track beds. The elevated
tracks on the right, then known as ''Kent Portal Yard'', have now been lifted in light of the
station construction having now reached a state of completion. David Glasspool
29th June 2004

Compare this photograph on the 29th June to the first photograph on the previous page from
10th May 2004: the differences are quite evident. Since the first day of track laying (10th May
2004) the central elevated section has received two lines and both have been ballasted. A further
two lines have been laid and ballasted on the left-hand side, whilst another two lines are being
laid on the right-hand side. David Glasspool
Return to the Kent Rail Homepage or alternatively, check for Updates.
Website & Copyright information - Links - Contact the Webmaster
All content is copyright © David Glasspool