

Swanley
The Southern Railway was swift to electrify ex-SE&CR suburban lines: scheduled
third rail electric operation commenced from Holborn Viaduct and Victoria, to Bickley and Orpington stations, on 12th July 1925. In the following year, the
section of the Tonbridge Cut-Off Line north of Orpington was electrified
throughout, to reach ex-SER termini at Charing Cross and Cannon Street;
scheduled electric services ran from 28th February 1926. Orpington remained as
the ‘’country’’ end terminus of the electric suburban network for a decade.
Thereafter, extension of the initial scheme of 1925 saw third rail taken south
to Sevenoaks, via both the ex-SER’s Cut-Off route and the ‘’Chatham’’ line via
Swanley and Bat & Ball, electric services commencing on 6th January 1935. It was
the SR’s final push eastwards to Gillingham, extending the scope of electric
operation in the late 1930s, which called for significant infrastructure changes
at Swanley Junction.
The existing station at Swanley Junction was positioned beyond the point of
divergence between the ‘’Chatham’’ main line and Bat & Ball branch. However, a
new timetable drafted for the extension of electric services to Gillingham
included a new operational requirement of splitting – and joining – train
formations here. For example, a two-unit electric formation heading from the
London direction could be split at Swanley, with one portion continuing on to
Gillingham, and the other embarking on the Bat & Ball branch (for either
Sevenoaks or Maidstone). As the layout at Swanley Junction stood, train
divisions would have to be undertaken in limbo, west of both the junction and
station. Not only was this inconvenient for both staff and passengers, but it
also blocked the main lines for those non-stop services. The rejoining of trains
would have been even more bizarre, with each laden formation departing from the
station, one at a time, only to stop about 200 yards further on, beyond the
junction, to couple together. As a result, it was decided to begin from scratch
and build a completely new station west of the junction, which would allow
division and rejoining of trains at the platforms. Since 16th April 1939,
the Junction station had been known as plain ‘’Swanley’’.
Throughout 1938, work ensued on widening the cutting to the west of Swanley
Junction, to accommodate a layout of two island platforms, served by four
tracks. The platforms were constituted of prefabricated concrete, produced at
the SR’s Exmouth Junction Works, and extended for a length of 820-feet. The
islands were protected by extensive W-shaped canopies, measuring 400-feet in
length by 28-feet in width, and were based on the same design as those which
emerged during the Tonbridge station rebuilding of 1935. A steel framework
supported a plain timber valance and a glass roof. Upon both islands were
constructed red brick offices, waiting rooms, and toilets, all of which featured
horizontal concrete lining around their roofs. Platforms were lit with electric lighting, supported
upon double-armed concrete bracket posts, and attached to the latter were the
SR’s renowned ‘’Target’’ name signs. Immediately east of the canopies existed an
enclosed passenger footbridge: of riveted steel construction, this extended for
a length of 130-feet, and boasted entrances both north and south of the line.
Housing estates had begun emerging along the line’s northern perimeter here
during the early 1930s (hence the footbridge connection), and the station’s main
building was initially planned for a site on the southern side of the cutting,
elevated upon the embankment. Unfortunately, an impressive structure had to be
forgone at the new station: the planning of a new trunk road was in full swing,
and it had yet to be decided where this would cross the railway. As a result,
cheap and easy to erect single-storey timber buildings were instead produced,
and these were to remain for the next three decades. Mention should also be made
of a second footbridge which crossed the new station site: this was of more
traditional lattice construction, demonstrating a main span of 115-feet, and
laid flush with the western ends of the platform canopies. The bridge
was dedicated to a public footpath and provided no access to the platforms,
although it was physically connected to the steel framework of the canopies.
30th June 2004

The lattice public footbridge which straddles the tracks at the western end of canopies can be seen above 4 VEP
No. 3423, which is seen forming the front of a Faversham to Victoria service. Under the pre-TOPS classification
this unit was numbered 7761, and in its final days was one of fourteen Veps which retained all four vehicles it was
originally delivered with. The large television screen stacks on either side of the photograph were installed during
1991, as part of the ''Networker'' scheme of driver-only-operation. David Glasspool
13th February 2006

An eastward view from the Southern Railway's station footbridge of 1939 shows the junction of the Faversham
and Bat & Ball routes. Swanley Junction station has all but gone, only grassy mounds within the V-shape of the
fork of lines now existing where the main building and platform surface once was. David Glasspool
25th February 2006

The footbridge is silhouetted in this evening view, depicting Un-rebuilt Battle of Britain Class No. 34067 ''Tangmere''
approaching with the ''Granville Express'', bound for Victoria. The concrete lampposts mark the former position of
a siding. David Glasspool
Next: the History Continues >>
Return to the Kent Rail Homepage or alternatively, check for Updates.
Website & Copyright information - Links - Contact the Webmaster
All content is copyright © David Glasspool