

Orpington
The
South Eastern Railway initiated a through service between London Bridge and
Dover, via Redhill and Tonbridge, on 7th February 1844. The route was a
circuitous one, the SER being compelled by Parliament to share the lines of the
London & Croydon and London & Brighton Railways between the capital and Redhill.
It was decreed that only one railway should enter London from the south.
Excepting the ongoing bickering between the respective companies over track
access, the additional mileage of this detour did not become problematic until
the advent of the ‘’East Kent Railway’’. Renamed the ‘’London Chatham & Dover
Railway’’ in 1859, this company eventually forged a shorter route between
Victoria and Dover via Chatham, through services commencing for the line’s
entirety on 22nd July 1861. The ‘’Chatham’’ main line became an attractive
alternative to the older Redhill route, thus the SER was in need of a plan to
prevent losing most of its London to Dover traffic to its new rival. The
solution was to shorten the London Bridge to Dover route by means of a cut-off
line, avoiding Redhill and providing a more direct route between the capital and
Tonbridge. Parliament authorised the line on 30th June 1862, for passage via
Chislehurst, Orpington, and Sevenoaks, taking 12½ miles off the original journey
length. The line was commissioned in stages: the St Johns to Chislehurst section
came into use on 1st July 1865; on 3rd February 1868, the line formally opened
to freight traffic for its full extent to Tonbridge, but passenger services were
only extended as far as Sevenoaks on 2nd March of that year. Through running to
Tonbridge for passenger traffic commenced on 1st May.
A station at Orpington came into use with the Sevenoaks section of the cut-off
line on 2nd March 1868. It started life as a typical SER rural outpost,
comprising two platform faces either side of a double-track. These surfaces lied
directly opposite each other, unlike those at a number of stations along the
route, which were staggered in nature. The main building was positioned on the
‘’up’’ side, and was a standard SER economical affair, being single-storey and
clapboard in construction, complete with a slated pitched roof. It was matched
on the ‘’down’’ platform by a structure of similar size and appearance, and both
buildings were equipped with flat-roofed canopies. The latter were graced with
the standard clover-patterned SER valance, which can still be seen in evidence
today at Maidstone West. The platforms were linked by a subway (a common feature
of those stations which were built upon embankments, where walkways could be
excavated more easily), positioned immediately to the south of the station
structures. The subway entrances were provided with brick surrounds, complete
with curved roofs, identical to those which are still extant at Bexley and
Northfleet stations. Both platforms were lined at their rears by wooden fencing,
a practice which is still in use today at Pluckley, and gas lamps were of the
typical diamond-shape design. There were no goods facilities at this station
from the outset, but during the first half of the 1890s, a single
northward-facing siding was incorporated. This trailed off the ‘’up’’ track at
about ten degrees to the running lines, and terminated behind the ‘’up’’ station
buildings.
The formation of the SE&CR on 1st January 1899 heralded significant improvements
for the Tonbridge cut-off line, and indeed, the suburban railway operation on
ex-SER and ex-LC&DR networks in general. In 1900, work commenced on linking the
‘’Chatham’’ main line with the ex-SER cut-off route, by means of installing
connecting loops, a task which was fully complete by 19th June 1904 (see the
Chislehurst Junction section). In the meantime, significant earthworks had begun
in the effort to upgrade the St Johns to Orpington section of the Tonbridge
cut-off line from double to quadruple-track operation. This involved extensive
rebuilds of stations at Hither Green, Grove Park, Chislehurst and Orpington, and
the provision of a new set of platforms at Elmstead Woods. Four-track running
for scheduled services commenced between St Johns and Elmstead Woods on 18th
June 1905, but this was preceded by the commissioning of the quadruple-track
section between Elmstead Woods and Orpington on 6th June of the previous year.
All traces of the SER’s Orpington station were swept away during the improvement
works. Extensive earthworks produced a wide cutting upon the existing station
site to accommodate a completely new layout capable of serving an intensive
four-track suburban and main line operation. The entire quadrupling scheme
formed part of the SE&CR’s desire to improve its commuter operation, which
included increasing service frequency and introducing new through trains between
ex-SER and ex-LC&DR networks. Orpington marked the end of the London commuting
zone on the Tonbridge cut-off line: four tracks converged into two beyond the
southern end of the station, and provision was made to keep terminating suburban
services out of the paths of those main line services continuing on into Kent.
Four through platform faces were created, each some 750-feet in length, and
these were flanked on either side by a northward-facing bay line for terminating
commuter services. The ‘’up’’ and ‘’down’’ side bay platforms measured 495-feet
and 575-feet in length respectively. This arrangement produced three main
platform surfaces, one of which was a centrally-located island. W-shaped
canopies appeared on all surfaces, these being supported upon iron frames and
demonstrating the intricate clover-patterned valance originally introduced by
the SER. The canopies appear to have been used as the design basis for those
plainer W-shaped designs employed by the Southern Railway during station
modernisations and rebuilds throughout the late 1920s and 1930s, on all
divisions of the company’s network (see Tonbridge and Swanley). The island
canopy measured 295-feet in length, whilst the presence of station structures on
both side platforms saw that the respective canopies on these surfaces were
longer, extending for 325-feet. The platforms were gas lit with the then
customary diamond-shaped lamps, as per the former station of 1868, and all
surfaces were linked by a subway.
Orpington’s main building, like that of the original station, was positioned on
the ‘’up’’ side, and was served by the very same approach road as the SER
clapboard structure. The replacement station had been built throughout in crème
brick: the ‘’up’’ building was single-storey, complete with a slated pitched
roof, and measured 110-feet in length, which included a small appendix attached
to its southern elevation. It was also in the company of a smaller crème brick
single-storey structure to its north; this measured 55-feet in length, but was
physically detached. Finally, the main building’s approach road elevation was
protected by a 42-foot long canopy, which demonstrated the same valance pattern
as the main platform structures. The ‘’down’’ side was also host to a
singe-storey crème brick structure; this was, in effect, a scaled-down version
of the aforementioned example on the ‘’up’’ side, and like its larger
counterpart, it was host to a porch canopy on its road-facing elevation.
Track plan of rebuilt SE&CR layout. Drawn by David
Glasspool
26th September 2004

Platforms 7 and 8 are the newest, having been incorporated as part of the 1992 station modifications.
They replaced a trio of sidings. A further giveaway sign that this platform is of a different era to the
others is its canopy, rectangular in appearance rather than W-shaped like its counterparts. ''Networkers''
Nos. 465033 and 465202 are seen stabled in the bays on 26th September 2004. David Glasspool
26th September 2004

A London-bound view shows the EMU sidings, covered until 1992 by the largest carriage shed on
the Southern Region. For most of its length, the carriage shed did not feature a third rail. In more
recent times, overhead gantries supporting lighting have appeared over the sidings. This is the scene
on 26th September 2004. David Glasspool
26th September 2004

A BREL product alongside a GEC build: on the left is Class 465 No. 465006, just about to depart
for London, whilst stabled in the bay platform is Class 466 No. 466033 (the latter pairing with a
Class 465 in NSE livery). The blue and yellow livery of No. 465006 was reached by simply applying
vinyl over the existing NSE livery, hence the cab ''flashes'' of the latter are still evident. The vinyl
coating was part of a leftover batch from the Class 365 livery applications. David Glasspool
Next: the History Continues >>
Return to the Kent Rail Homepage or alternatively, check for Updates.
Website & Copyright information - Links - Contact the Webmaster
All content is copyright © David Glasspool